AI-POWERED INTRALOGISTICS SOLUTIONS ARCHITECT

Vendor Neutral Warehouse Solutions Design and ROI Modelling Before Capital Commitment

Compare conventional racking, semi-automated shuttles, and full AS/RS or AMR solutions directly from your warehouse layout. Get independent capacity, CAPEX, and payback clarity before approaching equipment suppliers.

3 Comparative Architectural TiersUK & EN Standards-Aware ScreeningIndependent and confidential
Visual Solutions Showcase

Physical systems, evaluated against your building

Review the main storage and automation concepts. Select any system to carry it into your layout assessment.

01 / Racking & Shelving

Racking & Shelving Systems

Foundational structural storage engineered for spatial efficiency and SKU accessibility.

Selective pallet racking in a warehouseRacking & ShelvingEngineering concept

Pallet Racking Systems

Selective racking provides direct pallet access; VNA improves high-bay footprint use; Drive-In consolidates homogeneous batch SKUs.

Indicative density

45%–75%

Typical height

Up to 17m

CAPEX tier

£–££

Evaluate in My Layout
Longspan shelving with inclined carton-flow rollersRacking & ShelvingEngineering concept

Industrial Shelving & Carton Live Flow

Modular small-parts shelving and gravity-fed FIFO carton lanes support manual piece-picking and slow-to-medium velocity SKUs.

Pick-face access

100%

Picking mode

FIFO / manual

CAPEX tier

£

Evaluate in My Layout

02 / Mezzanines & Conveyors

Mezzanines & Conveyor Systems

Vertical floor multiplication and continuous automated material transport.

Multi-tier warehouse mezzanine with safety gates, stairs and chuteMezzanines & ConveyorsEngineering concept

Structural & Rack-Supported Mezzanines

One to three intermediate levels can increase usable floor area where clear height, structure, fire strategy and access permit.

Potential space gain

+100%–300%

Indicative loading

300–1,000 kg/m²

CAPEX tier

££

Evaluate in My Layout
Automated warehouse conveyor and robotic handling systemMezzanines & ConveyorsEngineering concept

Conveyor & High-Speed Sortation

Pallet infeed, outfeed and tote sortation can reduce repetitive travel when matched to validated process volumes.

Throughput

Continuous

Travel reduction

Up to 80%

CAPEX tier

££–£££

Evaluate in My Layout

03 / Semi & Full Automation

Semi-Automated & Full Fixed Automation

High-density automated storage and retrieval engineered for cube use and the required access profile.

Pallet shuttle cart operating inside a deep racking laneSemi & Full AutomationEngineering concept

Semi-Automated 2D Pallet Shuttle

Forklifts present pallets at the lane face while battery shuttles transfer loads deep into the rack, separating stock by lane.

Indicative density

70%–80%

Lane flow

LIFO / FIFO

CAPEX tier

£££

Evaluate in My Layout
Four-way pallet shuttle in a dense storage grid with transfer aisle and liftSemi & Full AutomationEngineering concept

4-Way Pallet Shuttle Systems

Shuttles move across a 3D grid with transfer aisles and lifts; suitability depends on building geometry and flow.

Indicative density

75%–85%

Routing

4-directional grid

CAPEX tier

£££–££££

Evaluate in My Layout
High-bay stacker crane working in a narrow storage aisleSemi & Full AutomationEngineering concept

High-Bay Stacker Crane AS/RS

Rail-guided cranes serve high-bay pallet or miniload aisles and connect to designed infeed and outfeed interfaces.

Typical clear height

12m–40m

Operation

24/7 capable

CAPEX tier

££££

Evaluate in My Layout

04 / AGVs, AMRs & AI Orchestration

Autonomous Mobile Robotics

Flexible robotic transport, automated piece-picking and next-generation fleet orchestration.

Automated guided forklift moving a pallet through a warehouseAGVs, AMRs & AI OrchestrationEngineering concept

Automated Guided Vehicles & Auto-Forklifts

Driverless pallet trucks and forklift AGVs can support repeatable putaway, staging and replenishment tasks.

Indicative payload

Up to 2,500kg

Availability

Multi-shift capable

CAPEX tier

£££

Evaluate in My Layout
Autonomous mobile robots bringing shelving pods to a goods-to-person station
Vision-guided robotic arm handling a warehouse item
AGVs, AMRs & AI OrchestrationEngineering concept

AMRs & Goods-to-Person Pick Robotics

AMRs can bring totes or shelving pods to pick stations; vision-guided arms suit defined products and validated rates.

Navigation

Dynamic SLAM

Fleet scale

Modular

CAPEX tier

£££

Evaluate in My Layout

Capacity, clear-height, density, loading and cost bands are indicative screening references only. Final feasibility depends on measured dimensions, loads, throughput, fire strategy, slab and site constraints.

Integrated Roadmap · Phase 02

End-to-End System Design Today. Unified AI Fleet Orchestration Tomorrow.

Phase 1 models the physical mix of racking, fixed automation and mobile robotics against your building and ROI targets. The upcoming Phase 2 orchestration engine is planned to connect multi-vendor AGVs, AMRs, 4-way shuttles and conveyor merges, synchronising flows to reduce congestion and balance peak workloads.

Phase 2 is on the product roadmap; this orchestration capability is not currently live.

Explore robotics in an assessment
Four-phase engineering methodology

Structured Engineering Governance from Feasibility to Capital Deployment

An institutional four-phase methodology engineered to de-risk capital expenditure, validate compliance, and protect commercial leverage prior to vendor engagement.

Stage 01COMPLIMENTARY

Upload Layout

Upload a plan and enter the warehouse, clear-area and operating details you know.

Stage 02COMPLIMENTARY

Receive 3-Concept ROI Report

Receive a preliminary comparison with assumptions and open questions clearly identified.

Stage 03FIXED-FEE AUDIT

On-Site Engineering Validation

Confirm building constraints, dimensions and operating conditions with an engineering site visit.

Stage 04SUPPLIER MATCHING

Regional Supplier Tendering

Request regional supplier introductions when you are ready to seek proposals.

Independent Governance at Every Capital Gate

Proceed to physical site validation or competitive supplier tendering strictly at your discretion.

Request fixed-fee site validation
Parametric Feasibility & Regulatory Screening

Deterministic engineering verification anchored to UK/EN structural, fire, and floor-flatness codes.

Each screen is tied to the confirmed warehouse boundary, customer inputs and drawing evidence. Missing values are called out rather than silently filled in.

01

Vertical Cube & Boundary Audit

Keep the customer-confirmed clear storage area separate from total building footprint and existing rack footprints. Compare measured clear height with rack levels where those values are available.

02

Multi-System Concept Screening

Screen deep-lane pallet shuttle, high-bay stacker-crane AS/RS and high-selectivity VNA racking against the load profile, clear area and operating information provided.

03

Total Cost & Payback Modelling

Present indicative CAPEX and operating-cost ranges with the assumptions shown. Fleet size, labour savings and payback need confirmed throughput, shifts, costs and supplier pricing.

04

Physical Constraint Identification

Capture or flag column grids, floor joints, dock interfaces, fire clearances, sprinklers and other obstructions. Unknown site conditions stay on the verification list.

Area alone cannot establish a safe rack design, MHE fleet or payback period. Detailed decisions need verified loads, site conditions, operating data and priced scope.

Why logistics leaders use ILAI first

Engineering clarity before supplier engagement.

Compare systems and assumptions first. Choose whether to proceed to validation or tendering on your terms.

Equipment-led process

Going Direct to Equipment Sales Teams

System recommendation
May centre on the systems offered by one equipment manufacturer.
Initial cost and turnaround
Sequential meetings and quotation cycles can take weeks.
Sales contact
Follow-up is part of the equipment supplier’s sales process.
Engineering approach
The initial discussion may focus on an equipment range.
Supplier tendering
Pricing may begin with one supplier’s scope and commercial basis.

Independent engineering screen

Starting with IntraLogicAI

System recommendation
Compare three storage concepts against the same confirmed site and operating inputs.
Initial cost and turnaround
Immediate online screening at no cost, with no sales meetings required.
Sales contact
Self-service assessment; no sales calls unless you request contact.
Engineering approach
Principal-Led Solutions Design & Parametric Simulation.
Supplier tendering
Request vetted regional supplier introductions when you are ready to tender.
Site validation

Book an On-Site Engineering Audit

Request a visit. Scope, fee and dates are agreed with you before anything is booked.

Use a company-domain email or valid business phone. Personal email alone is not accepted.

A marked-up plan can be shared after the audit scope is agreed.

CAD drawings remain confidential and are shared with suppliers only with your approval.